Change the Order of Topics in DITA Maps
You can change the order and nesting of the topics in a map in several ways:
- By dragging and dropping topics within the DITA Maps Manager.
- By highlighting a topic in the DITA Maps Manager, holding down the Alt key, and pressing the arrow keys.
- By showing the extended DITA Maps Manager toolbar (press the
Settings icon on the
DITA Maps
Manager toolbar and select the extended toolbar) and then using the
node moving buttons (


) on the toolbar to move topics
around in the map.