You can change the order and nesting of the topics in a map in several ways:
- By dragging and dropping topics within the DITA Maps
Manager.
- By showing the extended DITA Maps Manager toolbar (click the
Settings icon on the
DITA Maps
Manager toolbar and select the extended toolbar) and then using the
node moving buttons (


) on the toolbar to move topics
around in the map.
To understand how to organize topics in a
DITA map using the
DITA
Maps Manager, you can examine and experiment with the sample map called
flowers.ditamap, located in the
[OXYGEN_INSTALL_DIR]/samples/dita folder.